Summary
Software OTA update made charging faster. The post Xpeng to cut 10–80% charging time by 11% on existing EVs via over-the-air update appeared first on CarNewsChina.com .
Xpeng will raise the peak charging rate of its existing 5C-equipped EVs to 6C through an over-the-air software update. At its AI Day in Guangzhou, the automaker said the upgrade would cut the time needed to charge from 10% to 80% from 12 minutes to 10.7 minutes on a compatible DC fast charger.
Xpeng plans to roll out the update in stages across all models equipped with 5C batteries, including cars with lithium iron phosphate packs and those with ternary lithium batteries. Owners of eligible cars will get the higher rate on the battery already installed. The company has yet to publish a rollout schedule by model or market.
The C rate, or capacity rate, tells you how fast a battery can charge relative to its size. At 1C, an empty battery would fill in one hour if it kept charging at that rate. At 5C, it would take 12 minutes, and at 6C, 10 minutes. In practice, the battery reaches its top speed for only part of the session and charges more slowly as it fills.
In other words, the C rating expresses charging current relative to battery capacity. For the same battery, moving from 5C to 6C means it can accept 20% more current at its peak. The car draws that current for only part of a charging stop. Across the 10% to 80% window, Xpeng’s figures translate to a saving of 1 minute and 18 seconds, or about 11%.
Software plays a role because the car’s battery management system tells the charger how much current to supply. The request changes with the temperature of the cells and their state of charge. Raising the limit allows the same pack to accept more current when conditions permit. At a station already delivering its maximum output, the software update alone cannot increase the current available to the car.
Asked whether faster charging could affect battery safety, CEO He Xiaopeng said the company had tested the batteries under extreme conditions. Xpeng reported more than 1.2 million hours of durability testing in total. It put the equivalent driving distance at more than 25 million km, without explaining how it calculated that figure.
Xpeng also opened the first X-Energy station in September in San Po Kong, Hong Kong. Open to EVs of all brands, the station can deliver up to 1,000 kW (1 MW) and 1,000 amps.
Its 400 kWh on-site battery supplies extra power during fast charging, allowing the station to draw no more than 240 kW from the grid. On November 27, Xpeng said it planned a second Hong Kong station and its first X-Energy sites in Australia, Germany and the Netherlands.
Jiri Opletal
Editor-in-Chief
Jiri is the editor-in-chief of CNC and a lifelong EV enthusiast, having followed the China NEV boom since its inception. After ten years of eating dim sum in Shenzhen, he now keeps a close eye on China’s auto expansion across Asia and Europe.


